post

DSM provide logistical solution for Anglian Water

Anglian Water recently announced that Kier May Gurney and Clancy Docwra were the preferred bidders for the Integrated Maintenance and Repair (IMR) delivery route. An integrated team was created to ensure collaboration and success of their joint Business Plan.

One of the challenges they faced was the logistics – where could they accommodate a large team whose members would be able to reliably connect to the company systems and conduct multiple concurrent meetings in a central location with plenty of parking? It didn’t take long to work out that the facility they were contracted to use in an emergency scenario was ideal for a short term arrangement to accommodate the project team.

The DSM facility already had the necessary Anglian Water configuration for desktops and telephony so within a matter of days the team was installed and getting on with the project.

AW - project team

Said Alan Fox, leader of the integrated team: “The DSM facility was ideal for us to use as a base for bringing the entire team together for the duration of the contract bid. The comfortable office suite we were allocated to was very spacious and there was a fast connection to our home systems. The availability of several meeting rooms meant we never had difficulty in scheduling simultaneous get-togethers and the bottomless coffee pots and biscuits tins were much appreciated! The use of the DSM facility was an extremely convenient yet cost effective solution to what could have been a major issue.”

DSM can provide temporary office space to both contract and non-contract customers at highly attractive rates – if you have a short term requirement which you think we can fulfil please do not hesitate to contact us on 0845 094 0220 or visit www.business-continuity.co.uk